This is a proposal. Nothing is final, and no zoning application has been filed. Share your input
Rockdale Energy Center

Powering Rockdale County

Rockdale Energy Center is a proposed combined-cycle energy center off Hwy 212. It is early. Nothing is final, no application has been filed, and we are asking the community to help shape the plan first.

  • 457-acre property
  • Conceptual facility area
  • Proposed community park

Conceptual layout. It will change. Explore the map

457 acres
The whole property, on both sides of Hwy 212
45 acres
Developed: the facility and its connections. We've proposed a hard cap of 60.
247 acres
Preserved: forest and pasture that stays as it is today
165 acres
Proposed community park: all project land south of Hwy 212

These are current estimates. They will change as studies come back, and we will update them here when they do.

Nothing has been filed, approved, or built.

Multiple open houses will be held. The first one is scheduled for October 29. We won't file a rezoning application until after they're held, so what we hear can shape what gets filed.

What's fixed

The location, and the kind of facility: a combined-cycle energy center fueled by natural gas.

What's still open

The layout, buffers and screening, the setback distance, lighting, sound mitigation, construction traffic routes, and what goes in the community park.

What happens with your input

After each community meeting, we'll post what we heard and what changed because of it. See what we've heard so far.

It makes electricity and sends it to the public grid.

Rockdale Energy Center would generate power using combined-cycle technology, the same kind that already supplies more of Georgia's electricity than any other source. It makes electricity twice from the same fuel, which is what makes it so efficient.

  1. Natural gas arrives by underground pipeline and spins a turbine to make electricity.
  2. The leftover heat is captured and used to make steam.
  3. The steam spins a second turbine. More electricity, no extra fuel. The steam is then cooled with air, not water.
Natural gas arrives by underground pipeline and spins a turbine that makes electricity. The leftover heat makes steam. The steam spins a second turbine that makes more electricity. The steam is cooled with air and the water is reused. All of the electricity goes to the public grid. Natural gas Electricity To the public grid all of it Leftover heat Steam Cooled with air, not water Water is reused 1 2 3
Simplified diagram. The numbers match the three steps.

What it is, and what it is not

What it is

A power generator

It adds electricity to the same grid that serves Rockdale homes and businesses. It doesn't draw power off it.

What it is not

A data center

No data center would be allowed on this property, and none of the power would be set aside for one. We've proposed writing both into the zoning.

What it is not

A battery storage site

No battery containers are part of this proposal.

A rulebook written for this one property

We are not asking for general industrial zoning, which would open the property to a long list of uses. We're asking for a planned development, which the county calls a PUD: a zoning used to write rules for a single property.

Under it, we work with Rockdale County to spell out exactly what can be built here, where, how large, and what can never be built. The Board of Commissioners votes on those rules themselves, and they stay with the land no matter who owns it.

Proposed, not yet adopted

What we've offered to put in the rulebook so far

What it would allow

  • One electric generating facility.With its connections, capped at 60 acres. Today's estimate is about 45.
  • A minimum setback from every neighbor.The distance is still being set. Once it is, it goes in the zoning.
  • The existing forest kept as a buffer.Plus a landscaping plan approved by the county.
  • Noise limits at the property line.Verified by an independent sound study.
  • The park, in writing.About 165 acres south of Hwy 212 set aside as a community park, made binding through the zoning conditions.

What it would prohibit

  • No data center of any kind.Not on any part of the 457 acres.
  • No private power customer.No direct connection to a data center or any single large user. Power goes to the shared grid only.
  • No expansion.Nothing beyond the approved acreage.
  • No other industrial use.Now or later.
  • If it isn't built, the zoning goes back.The land could not be used for anything else industrial.

This list isn't finished. The open houses are where the rest of it gets written.

Tell us what you'd add

Rockdale has every reason to ask hard questions about safety.

We know what this community went through in 2024. Any new industrial neighbor should expect tougher questions because of it, and should answer them before asking for a vote. This is where we'd start.

What would you want to see in a safety plan? Tell us.

  • Nothing is made here except electricity.No chemical manufacturing and no chemical warehousing.
  • No fuel storage tanks.Natural gas arrives by underground pipeline and is used as it arrives. No trucks or rail hauling fuel.
  • Every material on site is reported.Water-treatment and emissions-control materials are kept in engineered, monitored containment and reported to Rockdale County Fire and emergency management under federal right-to-know rules. We'll post the list here too, as soon as the design is far enough along to know it.
  • An emergency plan written with the county.Developed with Rockdale County Fire, not handed to it, before the facility operates.
  • Watched around the clock.A control room staffed 24 hours a day, automatic gas shut-off valves, built-in fire suppression, and emissions monitored continuously and reported to Georgia EPD.
Preliminary estimates

What Rockdale would get

$15.6M
To Rockdale County Public Schools in the first full year of operation
$14.2M
To Rockdale County in the first full year of operation
350
Construction jobs at peak, over roughly three years
30
Permanent, full-time careers running the facility

Tax estimates use current county and school millage rates and a preliminary project cost, and assume no tax abatement or incentive. The amount is highest in the first year and steps down gradually as the equipment ages. The estimated total is more than $300 million over the first 15 years.

Proposed: a community park of about 165 acres

All project land south of Hwy 212 would become a community park, built by the project for Rockdale County. Ideas we've heard so far: walking and nature trails, ball fields, or open space left as it is. What goes in it is still open. See it on the map.

Revenue without the strain

The facility would add no students to the schools and use very little county service. Once operating, that means about 30 employees and a handful of deliveries a week.

Cooled with air, not water

It would use less than 1% of the water of a water-cooled facility. That water would come from the public system, not from wells, streams, or the river.

Why this property

A facility like this can only go where two things already exist: a high-voltage transmission line and a major natural gas pipeline. This property sits between both.

That keeps new construction short and mostly on site, and it's why the facility can sit deep inside the forest instead of along the road.

What's on the map

Show or hide map layers

Conceptual layout. It will change. The facility area, transmission line, and pipeline are shown in approximate locations.

How a decision gets made, and where you come in

Every step below has a public part. Nothing is built unless all of them are completed. Dates are targets and may shift with the county's schedule.

  1. Happening now

    Listening and studies

    Public open houses, and the studies that answer the open questions.

    • First open house: Thursday, October 29
    • More open houses to follow
    • Sound, environmental, wildlife, and cultural studies underway
  2. After the open houses

    Application

    A planned development (PUD) rezoning application to Rockdale County. Not filed until the open houses are done.

  3. Target: decision in January 2027

    County hearings

    Planning staff review, then Planning Commission and Board of Commissioners hearings. Anyone can speak.

  4. If approved

    State air permit

    A Georgia EPD review of about a year, with its own public notice and comment period.

  5. Target: 2031

    Operation

    Roughly three years of construction, beginning only after every approval.

Tell us what you think, before anything is filed.

Come to an open house, starting October 29, or write to us now. Questions, concerns, ideas for the community park, rules you'd want written into the zoning. We read and answer every message.