This is a proposal. Nothing is final, and no zoning application has been filed. Second open house: Tuesday, December 1
Rockdale Energy Center

The questions we hear most

Short answers, in plain language. Where we don't have an answer yet, we say so. If yours isn't here, ask it and we'll answer by email and bring it to the next open house. See everything we heard at the first open house, with our answers.

Ask a question

What is being proposed?

A combined-cycle energy center of about 1,000 megawatts that makes electricity from natural gas, on a 508-acre property off Hwy 212 in Rockdale County. The facility and its connections would take up an estimated 45 acres inside the forest. About 298 acres would stay as forest and pasture, and about 165 acres south of the highway would be set aside as community land.

Is any of this final?

No. No zoning application has been filed, and we won't file one until after the public open houses. The first was held October 29, and the second is Tuesday, December 1. The layout, buffers, the setback distance, the maximum acreage, sound mitigation, lighting, and how the community land is used are all still open.

When is the next open house?

Tuesday, December 1, 5:30 to 7:30 PM, at Restoration Storehouse, 1400 Parker Rd SE, Conyers, GA 30094. The entrance is at the north end of the building. It's the same place as the first open house, and everyone is welcome. Get directions.

The first open house was held Thursday, October 29. See what we heard there.

You don't have to wait for it: send your question now and we'll answer by email.

Is this a data center? Will it power one?

No, and no. We've proposed zoning conditions that would prohibit a data center anywhere on the property and prohibit a direct power line to any large private customer. Those conditions would stay with the land no matter who owns it.

Where does the electricity go?

All of it goes onto the public grid, the same grid that serves homes and businesses in Rockdale County and across Georgia. None of it would be reserved for a private customer.

Is it safe? What would be kept on site?

The facility would generate electricity; it would not manufacture or warehouse chemicals. Water-treatment and emissions-control materials would be kept in engineered, monitored containment, alongside transformers and electrical equipment like any substation. The detailed water, wastewater and materials-management plans are still being developed.

Every material on site is reported to Rockdale County Fire and emergency management under federal right-to-know rules. An emergency response plan would be written with the county before the facility operates, and the control room would be staffed 24 hours a day.

What about air quality?

The facility can't operate without an air permit from the Georgia Environmental Protection Division. That process includes a technical review, a public comment period, and enforceable operating, monitoring, recordkeeping and reporting requirements, including Best Available Control Technology (BACT). Emissions would be monitored continuously and reported to the state. A facility like this produces roughly half the CO₂ of a coal plant for the same electricity, with no coal ash.

More than 99.99% of what comes out of the stacks is air, water vapor and carbon dioxide. What comes out of the stacks.

How much water would it use?

Rockdale Energy Center is planned as an air-cooled facility. Current estimates put its water use at about 150 gallons a minute, about 3.4% of what a comparable water-cooled facility would need (about 4,400 gallons a minute).

The water would come from Rockdale's public water system. No project wells are proposed, and no water would be drawn from nearby streams or the river. The detailed water plan is still being developed with Rockdale County.

How loud would it be?

We don't have the final answer yet, and we won't guess. An independent sound study is underway to evaluate existing conditions and the sound the facility would make, including at night. It will help set the final layout, mitigation and sound standards, and we'll share the results when it's complete. The facility would be designed to meet county noise limits at the property line, with a minimum setback and forest between it and any home. The setback distance is still being set. It and the noise limits would be written into the zoning.

What would I be able to see?

The facility would sit inside the forest in the northern part of the property, away from Hwy 212. We drew it at its real size and location into views from seven nearby roads. In every one, trees and hills hide all or nearly all of it, though a little more may show in winter. The stacks are currently expected to be about 125 feet tall; final heights will be confirmed as engineering advances. See the views and the 360° fly-around.

What about traffic?

Construction would take about three years, and workers and deliveries would use Hwy 212. Access points and construction routes haven't been set yet.

Before construction begins, a construction traffic plan would be worked out with Rockdale County covering worker and delivery traffic, routes for heavy loads, construction hours, dust and mud control, road conditions and repairs, and how nearby residents are kept informed. We're working with our traffic consultant and Rockdale County to determine the appropriate level of traffic analysis, and we'll share traffic estimates once the construction assumptions are developed enough to make them reliable.

Once operating, the facility would have 25 to 30 employees and a limited number of routine deliveries.

Will this affect my property value?

Available research does not show a consistent or automatic effect on nearby property values. Reviews of modern natural gas facilities have found that impacts may be limited when visibility, sound, traffic, lighting, setbacks and screening are addressed. Here, the 508-acre wooded property lets the equipment sit far from homes behind natural screening.

Every property and local market is different, so no specific effect can be guaranteed. What we can commit to is what goes in the zoning: a minimum setback (the distance is still being set), the forest buffer, and sound standards. More on property values.

What does Rockdale County get out of it?

Based on preliminary estimates, in the first full year of operation: about $15.6 million to Rockdale County Public Schools and about $14.2 million to Rockdale County. There will be no property tax abatement. That amount steps down gradually as the equipment ages, for an estimated total of more than $300 million over 15 years. Add about 350 construction jobs at peak, 25 to 30 permanent careers, and about 165 acres of proposed community land.

Would local taxpayers pay for it?

No. The project would be privately financed. It would not use county funds, require a local tax increase, or receive a property tax abatement.

What kind of zoning is being requested?

Not general industrial zoning. We're asking for a planned unit development, or PUD, a zoning Rockdale County uses to write rules for a single property. Working with the county, we spell out exactly what can be built, where, how large, and what is prohibited. Those rules are voted on by the Board of Commissioners and stay with the land no matter who owns it.

What we've offered so far: no data center, no direct connection to any single large power user, a minimum setback (the distance is still being set), a maximum acreage for the facility (the number is still being set), noise limits at the property line, the forest kept as a buffer, no battery storage, no other industrial use, and no expansion beyond the approved acreage. These remain proposed conditions until the County acts on them.

How does approval work, and how can I weigh in?

After the open houses, we'd file a rezoning application with Rockdale County. That starts a public process: planning staff review, then Planning Commission and Board of Commissioners hearings where anyone can speak. The target for a county decision is March or April 2027. If the county approves, the facility would also need a Georgia EPD air permit and other state approvals, which have their own public notice and comment requirements.

You don't have to wait for a hearing. Share your input now, or come to the next open house.

Didn't find your question?

Ask it anytime. We answer every message, add common questions to this page, and bring the answers to the next open house.

Ask a question